Enterprise IT Solutions

Cloud & Virtualization Solutions for Business

Practical blends of on-premise, private cloud, and public cloud for your workloads.

Realistic hybrid cloud

Not every workload belongs in public cloud — latency, data residency, and egress costs can make on-premise more economical for some loads.

Hybrid combines on-premise control with cloud elasticity for burst, DR, or SaaS integration such as Microsoft 365.

Workload assessment

We map application dependencies, bandwidth needs, and data classification before recommending workload placement. Results feed a multi-year migration roadmap.

Controlled migration

Pilot workloads, phased cutover, and rollback plans reduce risk. Intilogy supports VM migration, cloud VPN/connectivity, and identity integration (Entra ID / AD).

Operations and cost control

Cloud capacity monitoring and resource tagging support finops. We help define scaling and backup policies for cloud workloads.

Industries we serve

Corporate · Manufacturing · Retail

Realistic hybrid cloud

Not every workload belongs in public cloud — latency, data residency, and egress costs can make on-premise more economical for some loads.

Workload assessment

We map application dependencies, bandwidth needs, and data classification before recommending workload placement. Results feed a multi-year migration roadmap.

How we work

Structured delivery from assessment to handover

Each phase has clear deliverables, owners, and acceptance criteria aligned to enterprise IT practice.

Approach

Controlled migration

Pilot workloads, phased cutover, and rollback plans reduce risk. Intilogy supports VM migration, cloud VPN/connectivity, and identity integration (Entra ID / AD).

Capabilities

Operations and cost control

Cloud capacity monitoring and resource tagging support finops. We help define scaling and backup policies for cloud workloads.

Use cases

Data center modernization

Dev/test

Cloud DR

Hybrid workloads

Cloud & Virtualization Solutions for Business

Our engineers help design, deploy, and support enterprise IT solutions across Indonesia.

Request a quote Contact our team

Case studies

Studi Kasus Terkait

Proyek nyata di lapangan — tantangan spesifik, solusi terukur, dan hasil yang terdokumentasi.

Hybrid Cloud for Government Agency

Industry Government

Challenge Data classification limited which workloads could use cloud. The IT team had limited hybrid operations experience.

Result More elastic portal capacity at service peaks; sensitive data remained on-premise per policy.

Transforming Industrial Safety & Efficiency with Edge AI Computer Vision

Industry Industrial / Mining / Manufacturing / Logistics

Challenge Managing expansive heavy industry environments inherently creates operational blind spots. Workplace accidents and asset breakdowns occur because human supervisors cannot constantly monitor thousands of critical points i

Result The implementation of this Computer Vision ecosystem delivered a measurable Return on Investment (ROI) in under six months:

Manufacturing Data Center Refresh

Industry Manufacturing

Challenge Servers neared end of life; critical VMs restarted due to storage latency.

Result Improved production application stability; database backup RPO met plant management targets.

Disaster Recovery Readiness for Government Agency

Industry Government

Challenge Backup jobs ran successfully but there was no evidence of successful restores. RPO/RTO were not agreed with application owners.

Result IT gained tested recovery procedures, documented RPO/RTO, and significantly improved restore confidence.

Firewall Upgrade for Financial Institution

Industry Financial Services

Challenge Legacy firewall rules were undocumented; years of ad-hoc changes accumulated. Audits required proof of segmentation and centralized logging.

Result Documented policies, improved incident visibility, and branch migrations without critical operational outages.

Storage Modernization for a National Retailer

Industry Retail

Challenge Operational data volume grew every quarter. Night backups often missed their window due to limited capacity and bandwidth. Cross-department file access was poorly controlled.

Result Backup windows shortened significantly, file access was more stable at peak hours, and IT had clear recovery procedures.

Corporate Endpoint Refresh

Industry Enterprise

Challenge Mixed specs per branch, slow onboarding, and decentralized warranty tracking.

Result Faster new-hire onboarding and more predictable support costs.

Related pages

E-E-A-T · Expertise & trust

Implementation expertise & enterprise trust

Intilogy (PT. Inti Jaya Teknologi) supports IT and procurement teams across Indonesia — from technical assessment and BoQ through deployment, documentation, and post go-live support.

  • 500+ Infrastructure deployments
  • 24/7 Operational support
  • SLA Enterprise SLA
  • 150+ Clients & institutions

Engineering & delivery expertise

Engineer-led assessment

Requirements workshops, sizing, and architecture — not catalogue selling without context.

Documented deployment

Commissioning checklists, as-built diagrams, IP plans, and escalation runbooks.

Audit-ready procurement

BoQ/BOM, quotations, POs, and handover packs for tenders and IT audits.

Multi-vendor coordination

One project partner for servers, networks, security, backup, and licensing.

Vendor ecosystem & sourcing channels

We source through official distributors/resellers per brand and project. Specific partnership tiers are confirmed per RFP — see our credentials page.

Vendor Status / tier Scope Notes
Dell Technologies Authorized channel PowerEdge, storage BoQ & manufacturer warranty
HPE Authorized channel ProLiant Enterprise servers
Fortinet Implementation partner NGFW, SD-WAN Licensing & deployment
Veeam Implementation partner Backup, replication Immutable design
VMware Implementation partner vSphere Cluster & migration
VMware Implementation partner vSphere Cluster & migration

Tiers vary by SKU/region. Contact sales@intilogy.com for distributor letters or engineer certificates.

Enterprise implementation methodology

Standard flow for infrastructure, security, and backup projects — scoped per contract.

  1. Discovery & assessment

    Duration: 1–2 weeks

    Deliverables Requirements & risk report

  2. Architecture & BoQ

    Duration: 1–2 weeks

    Deliverables HLD, BoQ, rollout plan

  3. Procurement & staging

    Duration: 2–4 weeks

    Deliverables Asset register

  4. Implementation & UAT

    Duration: 2–6 weeks

    Deliverables As-built, UAT sign-off

  5. Handover & operations

    Duration: Ongoing

    Deliverables SOPs, training, SLA if contracted

Support & SLA (per project contract)

Service levels are defined in agreement — example framework below.

Standard maintenance

Response
Next business day (remote)
Coverage
Firmware advisory, tickets, RMA
Notes
Indonesia business hours

Project warranty

Response
Per implementation contract
Coverage
Defects in Intilogy deployment scope
Notes
Not 24/7 unless agreed

Critical incident (optional)

Response
4–8 hours if contracted
Coverage
Production-critical escalation
Notes
Requires separate MSA

Response times are illustrative — binding only when written in contract.

Technical documentation delivered

  • Topology & rack diagrams (as-built)
  • Asset list, serials, warranty status
  • Critical config summary & change log
  • Basic operations runbook & escalation contacts
  • Restore / DR drill reports (if in scope)
  • Tender packs: distributor letters & engineer certs (on request)

Competency & certifications

Engineers train on vendor technologies per project. Individual certs (Fortinet NSE, VMware VCP, Veeam VMCE, etc.) are provided for tenders — not all listed publicly.

  • Engineer certifications — Per project technology — on request
  • Distributor letters — For procurement audit
  • Client references — See Clients page for logos & scope

View certifications & partnerships

Hybrid cloud & resilience

Workload placement, cloud backup, and measured recovery paths.

WhatsApp Consult on WhatsApp
Request Consultation WhatsApp