Enterprise IT Solutions

Trusted Enterprise IT Infrastructure Partnerin Indonesia

We implement enterprise server, storage, network, virtualization, and backup — from capacity assessment and BoQ through multi-vendor procurement, deployment, as-built documentation, and formal handover.

Enterprise server and storage needs

Servers and storage underpin ERP, databases, virtualization, and file services. Data growth and retention rules force periodic capacity and performance reviews.

Poor sizing — too small causing emergency upgrades, or too large wasting budget — can be avoided with assessment that models three to five years of growth.

Enterprise servers

Intilogy supplies Dell PowerEdge, HPE ProLiant, and Lenovo ThinkSystem configured for virtualization, databases, business applications, or hybrid workloads.

We support rack installation, cable management, RAID/hypervisor configuration, and handover documentation for your data center team.

NAS and mid-to-large storage

For file sharing, backup targets, surveillance, and VM storage, QNAP and Synology enterprise NAS offer snapshots, replication, and scalable disk.

Dual-controller and all-flash options exist for high IOPS workloads. We help migrate data with minimal operational disruption.

Procurement and support

Official procurement, manufacturer warranty, and implementation in one project. Post go-live support includes health checks, firmware advisories, and warranty renewal coordination.

Industries we serve

Manufacturing · Retail · Enterprise · Education · Government

Enterprise server and storage needs

Servers and storage underpin ERP, databases, virtualization, and file services. Data growth and retention rules force periodic capacity and performance reviews.

Enterprise servers

Intilogy supplies Dell PowerEdge, HPE ProLiant, and Lenovo ThinkSystem configured for virtualization, databases, business applications, or hybrid workloads.

How we work

Structured delivery from assessment to handover

Each phase has clear deliverables, owners, and acceptance criteria aligned to enterprise IT practice.

Approach

NAS and mid-to-large storage

For file sharing, backup targets, surveillance, and VM storage, QNAP and Synology enterprise NAS offer snapshots, replication, and scalable disk.

  • Dual-controller and all-flash options exist for high IOPS workloads. We help migrate data with minimal operational disruption.

Capabilities

Procurement and support

Official procurement, manufacturer warranty, and implementation in one project. Post go-live support includes health checks, firmware advisories, and warranty renewal coordination.

Trusted Enterprise IT Infrastructure Partner

Our engineers help design, deploy, and support enterprise IT solutions across Indonesia.

Schedule Infrastructure Consultation Send BoQ / Request Quote

Case studies

Studi Kasus Terkait

Proyek nyata di lapangan — tantangan spesifik, solusi terukur, dan hasil yang terdokumentasi.

Backup Ransomware Recovery for Enterprise

Industry Enterprise

Challenge The manufacturing company faced severe challenges with their existing backup system. Backup windows exceeded 12 hours nightly, causing performance degradation on production storage. More critically, they experienced a ra

Result Post-implementation, the manufacturing company achieved a 99.9% backup success rate with backup windows reduced from 12 hours to 2 hours. RPO improved from 24 hours to 1 hour, and RTO for critical VMs dropped from 72 hou

Veeam Backup for Enterprise

Industry Enterprise

Challenge The company faced frequent backup failures, with an average of 12-hour backup windows that often exceeded the available time. This resulted in incomplete backups and data loss risks. The RPO was 24 hours, meaning up to a

Result After implementing Veeam, the company achieved a 95% reduction in backup failures, with a success rate of 99.5%. The RPO was reduced from 24 hours to 1 hour, and the RTO for critical VMs dropped from 8 hours to 15 minute

Enterprise CCTV Monitoring for Warehouse Security

Industry Logistics

Challenge The legacy system had multiple critical failures: 1) Storage capacity was only 10TB, providing just 7 days of footage for 32 cameras at CIF resolution. To meet the new requirement of 200 cameras at 4K resolution with 90-

Result Post-deployment, the system achieved 99.99% uptime over 12 months with zero data loss. Video retention was extended to 90 days for all 200 cameras at 4K resolution, meeting compliance requirements. Theft incidents droppe

Data Center Migration for Enterprise

Industry Government

Challenge The primary technical challenge was migrating 200+ VMs with a total of 50 TB of data while maintaining business continuity. The existing environment had several pain points: the legacy SAN had only 12-hour backup windows

Result The migration was completed within the 3-month timeline with zero data loss and only 4 hours of total planned downtime for the physical servers. The RPO for critical VMs improved from 24 hours to 15 minutes, and RTO redu

Enterprise WiFi for Hospitality

Industry Healthcare

Challenge The group faced chronic WiFi issues, including frequent disconnections during peak hours, slow speeds in high-density areas like lobbies and ballrooms, and inability to support more than 50 devices per access point. Gues

Result Guest satisfaction scores improved by 35% within three months, with WiFi-related complaints dropping to near zero. The network now supports over 500 concurrent devices per property without degradation, and average throug

HCI Manufacturing for Enterprise

Industry Manufacturing

Challenge The existing three-tier infrastructure suffered from chronic performance bottlenecks: storage latency spiked to 50ms during peak production hours, causing MES slowdowns and 2% scrap rate increase. Backup windows exceeded

Result Post-implementation, storage latency dropped to under 1ms, eliminating production delays and reducing scrap rate to 0.5%. Backup windows shrank from 12 hours to 30 minutes, and RPO improved from 24 hours to 15 minutes. T

Hybrid Cloud Connectivity for Enterprise

Industry Enterprise

Challenge The primary technical challenge was achieving sub-10ms latency between on-premises and cloud resources for real-time IoT data processing. The existing MPLS links had 25ms latency and frequent packet loss during peak hour

Result Post-implementation, the company achieved sub-5ms latency between on-premises and cloud, with 99.99% uptime over 6 months. Backup RPO was reduced from 4 hours to 15 minutes, and RTO decreased to under 1 hour. The 12% bac

Infrastructure Assessment for Enterprise

Industry Enterprise

Challenge The manufacturer faced multiple critical issues. First, their backup system frequently failed, with a 12-hour backup window causing data loss risks and recovery times exceeding 48 hours. Second, network congestion during

Result Post-implementation, the manufacturer achieved a 99.99% backup success rate with RPO reduced from 24 hours to 1 hour and RTO from 48 hours to 4 hours. Network latency dropped to under 10ms, improving MES response times b

Related pages

E-E-A-T · Expertise & trust

IT infrastructure & data center expertise

Infrastructure engineers support server/storage sizing, VMware, rack & stack, and operational handover.

  • 500+ Infrastructure deployments
  • 24/7 Operational support
  • SLA Enterprise SLA
  • 150+ Clients & institutions

Engineering & delivery expertise

Engineer-led assessment

Requirements workshops, sizing, and architecture — not catalogue selling without context.

Documented deployment

Commissioning checklists, as-built diagrams, IP plans, and escalation runbooks.

Audit-ready procurement

BoQ/BOM, quotations, POs, and handover packs for tenders and IT audits.

Multi-vendor coordination

One project partner for servers, networks, security, backup, and licensing.

Vendor ecosystem & sourcing channels

We source through official distributors/resellers per brand and project. Specific partnership tiers are confirmed per RFP — see our credentials page.

Vendor Status / tier Scope Notes
Dell Technologies Authorized channel PowerEdge, storage BoQ & manufacturer warranty
HPE Authorized channel ProLiant Enterprise servers
Fortinet Implementation partner NGFW, SD-WAN Licensing & deployment
Veeam Implementation partner Backup, replication Immutable design
VMware Implementation partner vSphere Cluster & migration
VMware Implementation partner vSphere Cluster & migration

Tiers vary by SKU/region. Contact sales@intilogy.com for distributor letters or engineer certificates.

Enterprise implementation methodology

Standard flow for infrastructure, security, and backup projects — scoped per contract.

  1. Discovery & assessment

    Duration: 1–2 weeks

    Deliverables Requirements & risk report

  2. Architecture & BoQ

    Duration: 1–2 weeks

    Deliverables HLD, BoQ, rollout plan

  3. Procurement & staging

    Duration: 2–4 weeks

    Deliverables Asset register

  4. Implementation & UAT

    Duration: 2–6 weeks

    Deliverables As-built, UAT sign-off

  5. Handover & operations

    Duration: Ongoing

    Deliverables SOPs, training, SLA if contracted

Support & SLA (per project contract)

Service levels are defined in agreement — example framework below.

Standard maintenance

Response
Next business day (remote)
Coverage
Firmware advisory, tickets, RMA
Notes
Indonesia business hours

Project warranty

Response
Per implementation contract
Coverage
Defects in Intilogy deployment scope
Notes
Not 24/7 unless agreed

Critical incident (optional)

Response
4–8 hours if contracted
Coverage
Production-critical escalation
Notes
Requires separate MSA

Response times are illustrative — binding only when written in contract.

Technical documentation delivered

  • Topology & rack diagrams (as-built)
  • Asset list, serials, warranty status
  • Critical config summary & change log
  • Basic operations runbook & escalation contacts
  • Restore / DR drill reports (if in scope)
  • Tender packs: distributor letters & engineer certs (on request)

Competency & certifications

Engineers train on vendor technologies per project. Individual certs (Fortinet NSE, VMware VCP, Veeam VMCE, etc.) are provided for tenders — not all listed publicly.

  • Engineer certifications — Per project technology — on request
  • Distributor letters — For procurement audit
  • Client references — See Clients page for logos & scope

View certifications & partnerships

Infrastructure built for business workloads

Servers, storage, virtualization, and tiering for ERP, databases, and VDI.

WhatsApp Consult on WhatsApp
Request Consultation WhatsApp