Enterprise server and storage needs
Servers and storage underpin ERP, databases, virtualization, and file services. Data growth and retention rules force periodic capacity and performance reviews.
Enterprise IT Solutions
We implement enterprise server, storage, network, virtualization, and backup — from capacity assessment and BoQ through multi-vendor procurement, deployment, as-built documentation, and formal handover.
Servers and storage underpin ERP, databases, virtualization, and file services. Data growth and retention rules force periodic capacity and performance reviews.
Poor sizing — too small causing emergency upgrades, or too large wasting budget — can be avoided with assessment that models three to five years of growth.
Intilogy supplies Dell PowerEdge, HPE ProLiant, and Lenovo ThinkSystem configured for virtualization, databases, business applications, or hybrid workloads.
We support rack installation, cable management, RAID/hypervisor configuration, and handover documentation for your data center team.
For file sharing, backup targets, surveillance, and VM storage, QNAP and Synology enterprise NAS offer snapshots, replication, and scalable disk.
Dual-controller and all-flash options exist for high IOPS workloads. We help migrate data with minimal operational disruption.
Official procurement, manufacturer warranty, and implementation in one project. Post go-live support includes health checks, firmware advisories, and warranty renewal coordination.
Manufacturing · Retail · Enterprise · Education · Government
Servers and storage underpin ERP, databases, virtualization, and file services. Data growth and retention rules force periodic capacity and performance reviews.
Intilogy supplies Dell PowerEdge, HPE ProLiant, and Lenovo ThinkSystem configured for virtualization, databases, business applications, or hybrid workloads.
How we work
Each phase has clear deliverables, owners, and acceptance criteria aligned to enterprise IT practice.
Approach
For file sharing, backup targets, surveillance, and VM storage, QNAP and Synology enterprise NAS offer snapshots, replication, and scalable disk.
Capabilities
Official procurement, manufacturer warranty, and implementation in one project. Post go-live support includes health checks, firmware advisories, and warranty renewal coordination.
Our engineers help design, deploy, and support enterprise IT solutions across Indonesia.
Schedule Infrastructure Consultation Send BoQ / Request Quote
Case studies
Proyek nyata di lapangan — tantangan spesifik, solusi terukur, dan hasil yang terdokumentasi.
Industry Enterprise
Challenge The manufacturing company faced severe challenges with their existing backup system. Backup windows exceeded 12 hours nightly, causing performance degradation on production storage. More critically, they experienced a ra
Result Post-implementation, the manufacturing company achieved a 99.9% backup success rate with backup windows reduced from 12 hours to 2 hours. RPO improved from 24 hours to 1 hour, and RTO for critical VMs dropped from 72 hou
Industry Enterprise
Challenge The company faced frequent backup failures, with an average of 12-hour backup windows that often exceeded the available time. This resulted in incomplete backups and data loss risks. The RPO was 24 hours, meaning up to a
Result After implementing Veeam, the company achieved a 95% reduction in backup failures, with a success rate of 99.5%. The RPO was reduced from 24 hours to 1 hour, and the RTO for critical VMs dropped from 8 hours to 15 minute
Industry Logistics
Challenge The legacy system had multiple critical failures: 1) Storage capacity was only 10TB, providing just 7 days of footage for 32 cameras at CIF resolution. To meet the new requirement of 200 cameras at 4K resolution with 90-
Result Post-deployment, the system achieved 99.99% uptime over 12 months with zero data loss. Video retention was extended to 90 days for all 200 cameras at 4K resolution, meeting compliance requirements. Theft incidents droppe
Industry Government
Challenge The primary technical challenge was migrating 200+ VMs with a total of 50 TB of data while maintaining business continuity. The existing environment had several pain points: the legacy SAN had only 12-hour backup windows
Result The migration was completed within the 3-month timeline with zero data loss and only 4 hours of total planned downtime for the physical servers. The RPO for critical VMs improved from 24 hours to 15 minutes, and RTO redu
Industry Healthcare
Challenge The group faced chronic WiFi issues, including frequent disconnections during peak hours, slow speeds in high-density areas like lobbies and ballrooms, and inability to support more than 50 devices per access point. Gues
Result Guest satisfaction scores improved by 35% within three months, with WiFi-related complaints dropping to near zero. The network now supports over 500 concurrent devices per property without degradation, and average throug
Industry Manufacturing
Challenge The existing three-tier infrastructure suffered from chronic performance bottlenecks: storage latency spiked to 50ms during peak production hours, causing MES slowdowns and 2% scrap rate increase. Backup windows exceeded
Result Post-implementation, storage latency dropped to under 1ms, eliminating production delays and reducing scrap rate to 0.5%. Backup windows shrank from 12 hours to 30 minutes, and RPO improved from 24 hours to 15 minutes. T
Industry Enterprise
Challenge The primary technical challenge was achieving sub-10ms latency between on-premises and cloud resources for real-time IoT data processing. The existing MPLS links had 25ms latency and frequent packet loss during peak hour
Result Post-implementation, the company achieved sub-5ms latency between on-premises and cloud, with 99.99% uptime over 6 months. Backup RPO was reduced from 4 hours to 15 minutes, and RTO decreased to under 1 hour. The 12% bac
Industry Enterprise
Challenge The manufacturer faced multiple critical issues. First, their backup system frequently failed, with a 12-hour backup window causing data loss risks and recovery times exceeding 48 hours. Second, network congestion during
Result Post-implementation, the manufacturer achieved a 99.99% backup success rate with RPO reduced from 24 hours to 1 hour and RTO from 48 hours to 4 hours. Network latency dropped to under 10ms, improving MES response times b
E-E-A-T · Expertise & trust
Infrastructure engineers support server/storage sizing, VMware, rack & stack, and operational handover.
Requirements workshops, sizing, and architecture — not catalogue selling without context.
Commissioning checklists, as-built diagrams, IP plans, and escalation runbooks.
BoQ/BOM, quotations, POs, and handover packs for tenders and IT audits.
One project partner for servers, networks, security, backup, and licensing.
We source through official distributors/resellers per brand and project. Specific partnership tiers are confirmed per RFP — see our credentials page.
| Vendor | Status / tier | Scope | Notes |
|---|---|---|---|
| Dell Technologies | Authorized channel | PowerEdge, storage | BoQ & manufacturer warranty |
| HPE | Authorized channel | ProLiant | Enterprise servers |
| Fortinet | Implementation partner | NGFW, SD-WAN | Licensing & deployment |
| Veeam | Implementation partner | Backup, replication | Immutable design |
| VMware | Implementation partner | vSphere | Cluster & migration |
| VMware | Implementation partner | vSphere | Cluster & migration |
Tiers vary by SKU/region. Contact sales@intilogy.com for distributor letters or engineer certificates.
Standard flow for infrastructure, security, and backup projects — scoped per contract.
Service levels are defined in agreement — example framework below.
Response times are illustrative — binding only when written in contract.
Engineers train on vendor technologies per project. Individual certs (Fortinet NSE, VMware VCP, Veeam VMCE, etc.) are provided for tenders — not all listed publicly.
Servers, storage, virtualization, and tiering for ERP, databases, and VDI.