Benefit 1
Structured traceable BoQ/BoM
IT Procurement & Fleet
We help IT and procurement teams run hardware, software license, and implementation purchases with audit-ready BoQ/BoM documentation — separate from architecture design and managed operations.
How we work
Each phase has clear deliverables, owners, and acceptance criteria aligned to enterprise IT practice.
Key benefits
We help IT and procurement teams run hardware, software license, and implementation purchases with audit-ready BoQ/BoM documentation — separate from architecture design and managed operations.
Structured traceable BoQ/BoM
Official multi-vendor quotes
Coordinated delivery
Aligns with internal procurement policy
Scope
Modular capabilities aligned to your infrastructure and procurement needs.
Our engineers help design, deploy, and support enterprise IT solutions across Indonesia.
Case studies
Proyek nyata di lapangan — tantangan spesifik, solusi terukur, dan hasil yang terdokumentasi.
Industry Enterprise
Challenge The legacy system posed several critical challenges. First, it lacked centralized management: each building had its own controller, and security personnel had to physically visit each location to manage credentials or re
Result Post-implementation, the company achieved a 95% reduction in unauthorized access attempts within the first quarter. The centralized management platform reduced credential update time from 48 hours to under 5 minutes, sig
Industry Manufacturing
Challenge The primary challenge was the lack of integration between access control and other security systems. The legacy system had 15 separate databases for different zones, leading to inconsistencies and delays in updating acce
Result The new system reduced unauthorized entry attempts by 95% within the first month. Access provisioning time dropped from 72 hours to under 5 minutes, saving 20 man-hours per week for the security team. The integrated logg
Industry Retail
Challenge The primary technical challenge was the lack of a centralized access control platform. Each store operated independently, with local administrators managing user credentials and schedules. This resulted in a 48-hour dela
Result Post-implementation, the retail chain achieved a 95% reduction in unauthorized access incidents and a 30% decrease in shrinkage within the first six months. Employee access revocation time dropped from 48 hours to under
Industry Enterprise
Challenge The manufacturing company faced severe challenges with their existing backup system. Backup windows exceeded 12 hours nightly, causing performance degradation on production storage. More critically, they experienced a ra
Result Post-implementation, the manufacturing company achieved a 99.9% backup success rate with backup windows reduced from 12 hours to 2 hours. RPO improved from 24 hours to 1 hour, and RTO for critical VMs dropped from 72 hou
Industry Enterprise
Challenge The company faced frequent backup failures, with an average of 12-hour backup windows that often exceeded the available time. This resulted in incomplete backups and data loss risks. The RPO was 24 hours, meaning up to a
Result After implementing Veeam, the company achieved a 95% reduction in backup failures, with a success rate of 99.5%. The RPO was reduced from 24 hours to 1 hour, and the RTO for critical VMs dropped from 8 hours to 15 minute
Industry Enterprise
Challenge The primary challenge was the high error rate in inventory records. Manual data entry resulted in approximately 12% inaccuracy, causing stockouts of critical components and excess inventory of slow-moving items. This led
Result Post-implementation, inventory accuracy improved to 99.5%, reducing stockouts by 90%. Cycle counting now takes 4 hours per warehouse without disrupting operations. The company eliminated 15 data entry positions through a
Industry Logistics
Challenge The primary challenge was a 23% inventory inaccuracy rate, causing annual losses of over IDR 5 billion due to overstocking and stockouts. Manual data entry resulted in average 2-hour delays in updating SAP after goods re
Result Post-implementation, inventory accuracy improved from 77% to 99.5%. Order fulfillment errors dropped to under 1%, and the 2-hour data entry delay was eliminated, achieving real-time SAP updates. The RPO (Recovery Point O
Industry Enterprise
Challenge The primary technical challenge was the existing system's inability to handle the required bandwidth and storage for 4K cameras. With 500 cameras planned, the network needed to support over 20 Gbps of sustained throughpu
Result Post-implementation, the company achieved 99.99% uptime for the CCTV system, with zero data loss during backup windows. The RPO was reduced from 24 hours to 1 hour, and RTO decreased to 15 minutes. The new infrastructure
In this topic
In-depth pages per need — part of the same topical silo.
Streamline enterprise IT procurement in Indonesia with Intilogy. Partner with Cisco, Fortinet, Lenovo, HP, Dell, and Synology for hardware,...
Learn more →Enterprise BOQ LICENSING in Indonesia: automate bill of quantities with SAP, Oracle, and Microsoft integration. Improve cost estimation accu...
Learn more →Enterprise server procurement in Indonesia: Dell, HPE, Lenovo, Cisco UCS. Optimize virtualization, HCI, and storage with Intilogy's technica...
Learn more →Enterprise storage procurement in Indonesia: Dell, HP, Lenovo, Synology, QNAP. HCI, SAN, NAS solutions for high availability, backup, and di...
Learn more →Enterprise network procurement in Indonesia: Cisco, Fortinet, Ruijie switches, routers, firewalls, and Wi-Fi. Scalable, secure, and reliable...
Learn more →E-E-A-T · Expertise & trust
Intilogy (PT. Inti Jaya Teknologi) supports IT and procurement teams across Indonesia — from technical assessment and BoQ through deployment, documentation, and post go-live support.
Requirements workshops, sizing, and architecture — not catalogue selling without context.
Commissioning checklists, as-built diagrams, IP plans, and escalation runbooks.
BoQ/BOM, quotations, POs, and handover packs for tenders and IT audits.
One project partner for servers, networks, security, backup, and licensing.
We source through official distributors/resellers per brand and project. Specific partnership tiers are confirmed per RFP — see our credentials page.
| Vendor | Status / tier | Scope | Notes |
|---|---|---|---|
| Dell Technologies | Authorized channel | PowerEdge, storage | BoQ & manufacturer warranty |
| HPE | Authorized channel | ProLiant | Enterprise servers |
| Fortinet | Implementation partner | NGFW, SD-WAN | Licensing & deployment |
| Veeam | Implementation partner | Backup, replication | Immutable design |
| VMware | Implementation partner | vSphere | Cluster & migration |
| VMware | Implementation partner | vSphere | Cluster & migration |
Tiers vary by SKU/region. Contact sales@intilogy.com for distributor letters or engineer certificates.
Standard flow for infrastructure, security, and backup projects — scoped per contract.
Service levels are defined in agreement — example framework below.
Response times are illustrative — binding only when written in contract.
Engineers train on vendor technologies per project. Individual certs (Fortinet NSE, VMware VCP, Veeam VMCE, etc.) are provided for tenders — not all listed publicly.
Our team supports assessment, recommendations, procurement, and documented implementation.