Network & Communication

Networking Solutions for Office and Data Center

Reliable networks underpin cloud, security, and collaboration. We design architectures built to scale.

Networks as a digital foundation

Stable connectivity supports cloud, security, and collaboration. Poor network design worsens security incidents and reduces productivity.

Intilogy starts with business mapping: users, critical applications, downtime tolerance, and three-to-five-year expansion plans.

Campus, branch, and data center

Head offices need high-capacity core switching, VLAN segmentation, and links to cloud or DR sites. Branches need template configs for predictable rollout and support.

Data center fabrics require link redundancy, stable routing, and LLD documentation for audit and troubleshooting.

Enterprise wireless

Corporate Wi‑Fi must separate employee, guest, and IoT SSIDs. Site surveys determine AP density and eliminate dead zones in warehouses or meeting areas.

We deploy controller-based wireless with Cisco, Aruba, Ubiquiti, or Ruckus depending on scale and budget.

Security at the network edge

Branch and HQ firewalls align with central policy. Site-to-site VPN or SD-WAN can replace costly MPLS where traffic profiles fit.

Segmentation limits lateral movement when an endpoint is compromised — essential in the ransomware era.

Documentation and handover

Every project includes topology diagrams, IP plans, device lists, and escalation runbooks so internal IT can operate independently.

Ongoing support

Optional maintenance covers periodic health checks, link capacity reviews, and scheduled firmware upgrades outside peak hours.

Industries we serve

Retail · Corporate · Hospitality · Education

Networks as a digital foundation

Stable connectivity supports cloud, security, and collaboration. Poor network design worsens security incidents and reduces productivity.

Campus, branch, and data center

Head offices need high-capacity core switching, VLAN segmentation, and links to cloud or DR sites. Branches need template configs for predictable rollout and support.

How we work

Structured delivery from assessment to handover

Each phase has clear deliverables, owners, and acceptance criteria aligned to enterprise IT practice.

Approach

Enterprise wireless

Corporate Wi‑Fi must separate employee, guest, and IoT SSIDs. Site surveys determine AP density and eliminate dead zones in warehouses or meeting areas.

  • We deploy controller-based wireless with Cisco, Aruba, Ubiquiti, or Ruckus depending on scale and budget.

Capabilities

Security at the network edge

Branch and HQ firewalls align with central policy. Site-to-site VPN or SD-WAN can replace costly MPLS where traffic profiles fit.

  • Segmentation limits lateral movement when an endpoint is compromised — essential in the ransomware era.

Operations

Documentation and handover

Every project includes topology diagrams, IP plans, device lists, and escalation runbooks so internal IT can operate independently.

Outcomes

Ongoing support

Optional maintenance covers periodic health checks, link capacity reviews, and scheduled firmware upgrades outside peak hours.

Use cases

Corporate campuses

Branch offices

Data center fabrics

Guest Wi‑Fi

Networking Solutions for Office and Data Center

Our engineers help design, deploy, and support enterprise IT solutions across Indonesia.

Request a quote Contact our team

Case studies

Studi Kasus Terkait

Proyek nyata di lapangan — tantangan spesifik, solusi terukur, dan hasil yang terdokumentasi.

Enterprise WiFi Access Point for Manufacturing

Industry Manufacturing

Challenge The primary challenge was severe co-channel interference and signal degradation in the production floor due to metal racks and moving machinery. The legacy access points could not handle more than 20 concurrent clients p

Result Post-deployment, the factory experienced a 40% increase in overall network throughput, with average client speeds exceeding 200 Mbps. The warehouse scanner downtime dropped from 12% to under 1%, directly improving order

Enterprise WiFi for Hospitality

Industry Healthcare

Challenge The group faced chronic WiFi issues, including frequent disconnections during peak hours, slow speeds in high-density areas like lobbies and ballrooms, and inability to support more than 50 devices per access point. Gues

Result Guest satisfaction scores improved by 35% within three months, with WiFi-related complaints dropping to near zero. The network now supports over 500 concurrent devices per property without degradation, and average throug

H3C IMC for Enterprise

Industry Manufacturing

Challenge <p>The existing network management approach resulted in an average of 12 hours per week spent on manual configuration changes and troubleshooting. Unplanned network outages occurred 3-4 times per month, with an average d

Result <p>After implementing H3C IMC, the manufacturer reduced unplanned network downtime by 85%, from 12 hours per month to less than 2 hours. The mean time to repair (MTTR) dropped from 4 hours to 30 minutes, thanks to automa

Multi-Site Network for Enterprise

Industry Enterprise

Challenge The primary technical challenge was the high latency and packet loss experienced on the MPLS network, especially for cloud-based applications like Office 365 and Salesforce. Latency spikes reached up to 300ms during peak

Result Post-implementation, the enterprise achieved a 70% reduction in network latency for critical applications, with average latency dropping from 250ms to under 40ms. Application performance improved significantly, with Offi

Network Datacenter Fabric for Enterprise

Industry Enterprise

Challenge The primary challenge was the inability to scale east-west bandwidth: the existing core-distribution-access design limited inter-server throughput to 10 Gbps, while VM migrations and backup traffic required 40 Gbps. Duri

Result Post-implementation, east-west throughput increased to 400 Gbps, eliminating packet loss and reducing backup failures to zero. The backup window shrank from 12 hours to 2 hours, and RPO decreased from 24 hours to 1 hour.

Network Modernization for Enterprise

Industry Healthcare

Challenge The client's network was plagued by several critical issues. First, the core switch experienced a 12-hour outage due to a firmware bug, halting production entirely. Second, inter-site latency averaged 50 ms, causing dela

Result Post-modernization, the client achieved dramatic improvements: network uptime increased to 99.995%, with zero unplanned outages in the first six months. Inter-site latency dropped from 50 ms to under 5 ms, enabling real-

Network Monitoring NOC for Enterprise

Industry Enterprise

Challenge The manufacturing network faced several critical challenges. First, the mean time to detect (MTTD) network failures was over 30 minutes, as alerts were generated only after threshold-based polling intervals. For example,

Result Post-implementation, the manufacturing company achieved a 90% reduction in MTTD from 30 minutes to under 3 minutes, and MTTR decreased from 4 hours to 45 minutes. Network availability improved from 99.5% to 99.99%, elimi

Network Retail Rollout for Enterprise

Industry Retail

Challenge The primary technical challenge was ensuring high availability and low latency across 200 geographically dispersed stores, many in areas with limited fiber optic infrastructure. Over 30% of stores relied on single-ISP DS

Result The network retail rollout delivered significant improvements in uptime, performance, and security. Store network availability increased from 95% to 99.99%, reducing POS downtime from 4 hours per month to under 5 minutes

Related pages

E-E-A-T · Expertise & trust

Implementation expertise & enterprise trust

Intilogy (PT. Inti Jaya Teknologi) supports IT and procurement teams across Indonesia — from technical assessment and BoQ through deployment, documentation, and post go-live support.

  • 500+ Infrastructure deployments
  • 24/7 Operational support
  • SLA Enterprise SLA
  • 150+ Clients & institutions

Engineering & delivery expertise

Engineer-led assessment

Requirements workshops, sizing, and architecture — not catalogue selling without context.

Documented deployment

Commissioning checklists, as-built diagrams, IP plans, and escalation runbooks.

Audit-ready procurement

BoQ/BOM, quotations, POs, and handover packs for tenders and IT audits.

Multi-vendor coordination

One project partner for servers, networks, security, backup, and licensing.

Vendor ecosystem & sourcing channels

We source through official distributors/resellers per brand and project. Specific partnership tiers are confirmed per RFP — see our credentials page.

Vendor Status / tier Scope Notes
Dell Technologies Authorized channel PowerEdge, storage BoQ & manufacturer warranty
HPE Authorized channel ProLiant Enterprise servers
Fortinet Implementation partner NGFW, SD-WAN Licensing & deployment
Veeam Implementation partner Backup, replication Immutable design
VMware Implementation partner vSphere Cluster & migration
VMware Implementation partner vSphere Cluster & migration

Tiers vary by SKU/region. Contact sales@intilogy.com for distributor letters or engineer certificates.

Enterprise implementation methodology

Standard flow for infrastructure, security, and backup projects — scoped per contract.

  1. Discovery & assessment

    Duration: 1–2 weeks

    Deliverables Requirements & risk report

  2. Architecture & BoQ

    Duration: 1–2 weeks

    Deliverables HLD, BoQ, rollout plan

  3. Procurement & staging

    Duration: 2–4 weeks

    Deliverables Asset register

  4. Implementation & UAT

    Duration: 2–6 weeks

    Deliverables As-built, UAT sign-off

  5. Handover & operations

    Duration: Ongoing

    Deliverables SOPs, training, SLA if contracted

Support & SLA (per project contract)

Service levels are defined in agreement — example framework below.

Standard maintenance

Response
Next business day (remote)
Coverage
Firmware advisory, tickets, RMA
Notes
Indonesia business hours

Project warranty

Response
Per implementation contract
Coverage
Defects in Intilogy deployment scope
Notes
Not 24/7 unless agreed

Critical incident (optional)

Response
4–8 hours if contracted
Coverage
Production-critical escalation
Notes
Requires separate MSA

Response times are illustrative — binding only when written in contract.

Technical documentation delivered

  • Topology & rack diagrams (as-built)
  • Asset list, serials, warranty status
  • Critical config summary & change log
  • Basic operations runbook & escalation contacts
  • Restore / DR drill reports (if in scope)
  • Tender packs: distributor letters & engineer certs (on request)

Competency & certifications

Engineers train on vendor technologies per project. Individual certs (Fortinet NSE, VMware VCP, Veeam VMCE, etc.) are provided for tenders — not all listed publicly.

  • Engineer certifications — Per project technology — on request
  • Distributor letters — For procurement audit
  • Client references — See Clients page for logos & scope

View certifications & partnerships

Networking & data center connectivity

Core, distribution, wireless, and segmentation for 24/7 operations.

WhatsApp Consult on WhatsApp
Request Consultation WhatsApp